Scroll Top

Drainforce Case Study

Title: Dyer & Butler Barkingside

Contract Value: £75,000

Contract Dates: December 2020 – March 2021

Scope of Services:

● Design
● Cleaning
● CCTV
● UV Lining
● Headwall Construction
● CCTV Pre and Post
● Overpumping

Introduction: Drainforce were tasked to rectify defective pipe UTX drain and headwall that was becoming unstable along a LUL banking. The pipe in question was a Surface Water Pipe 900mm long 25m in Length.
Drainforce completed Topographical Surveys and Designs to LUL standards for both the UV Lining and Structural Headwall taking into account bank Stabilisation.
After Pre-Site Meetings and planning a Method Statement and Safe Working System was confirmed and signed off.

Before Works commenced Pre Site Meetings and Briefing’s were completed Daily ensuring the details of the Method Statements were filtered through and that Daily Dynamic Risk Assessments were completed monitoring Weather and any variable conditions.

Drainforce arranged access to the site through land agents. We cleaned the culvert with recyclers which have a high volume of water ideal for removing large volumes of silt from the culverts without the requirement to pull off and fill up with water allowing for all works to be completed during tight time scales.

Once the lines had been cleaned Drainforce set up over pumping and delivered the 5t liner to site though specialised track cranes.

The Liner was winched into position and cured with our Mega UV Rig. The liner was manufactured with an additional outer back for free in Air Lining.

The purpose of this was to extend the liner past the existing head wall to allow the new head wall to be built around the Liner while keeping the old headwall in position and not effecting the stability of the bank.

Health & Safety
Drainforce had Zero incidents during the project.

Staff Competence
LUL ICI
PTS
BTA
First Aid
Track Trolley
SPC
Wrc approved lining installers for UV lining with approved products
Street Works
Confined Space
Risk Awareness
First Aid
Water Jetting Association
Associated Training on Equipment (Prokasro, Whale)
Asbestos
Manual Handling
OS19X and 21X

Quality Assurance
Drainforce are ISO 9001 and 14001 certified. We continuously monitor and improve our quality of services to this contract through the following points

Collabrorative Working

Drain force attend weekly meetings with the land owners and client on site and in their offices with a fluid project plan updated. Daily Work sheets and updates are also emailed.

Plant and Equipment:
Drainforce Made use of it’s portable UV system to allow for a set up on Track distances to far away for the UV Rig to use. We also used our Main Line UV Mega Rig which has a 500m air conditioned cable.
This would not of been possible with Standard Equipment.
All Equipment was less than 80dbs complying with Council noise regulations.

Value for Money
Drainforce provide excellent value for money through efficiencies on site and experience staff. An attitude of getting it right first time and over delivering works to ensure repeat visits are not required. We offer excellent value for money through a schedule of rates with a clear transparent invoicing system which is charged on what we do not how long we spend on a job.

 

 

 

 

 

 

 

 

 

 