Shortlisted – New Installation Energy & Communications

Shortlisted for the New Installation – Energy & Communications Award is;

Eco Drill Ltd / Volker Infrastructure / A F Howlands Associates / Alresford Associates – Hornsea 2 Wind Farm Onshore
Eco-Drill Ltd undertook horizontal directional drilling at 62 locations along a 40 km route from Horseshoe Point, south of Grimsby, to the National Grid onshore substation in North Killingholme, installing 3 individual directional drills at each location for the Hornsea 2 Wind farm ( an addition to the world’s largest off shore windfarm). Each of the individual 186 drills involved installing 3 way 250mm SDR 11 electric cable duct in tre-foil configuration from 40m to 400m in length. The use of Radius Pipe systems “ClearDuct” pipe resulted in no internal de-beading required which meant the elimination of cctv survey.

Privacy Preferences
When you visit our website, it may store information through your browser from specific services, usually in form of cookies. Here you can change your privacy preferences. Please note that blocking some types of cookies may impact your experience on our website and the services we offer.