BEGIN:VCALENDAR
VERSION:2.0
METHOD:PUBLISH
CALSCALE:GREGORIAN
PRODID:-//WordPress - MECv7.33.0//EN
X-ORIGINAL-URL:https://www.ukstt.org.uk/
X-WR-CALNAME:UKSTT
X-WR-CALDESC:TRENCHLESS TECHNOLOGY
X-WR-TIMEZONE:Europe/London
BEGIN:VTIMEZONE
TZID:Europe/London
X-LIC-LOCATION:Europe/London
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20260329T020000
RRULE:FREQ=YEARLY;BYMONTH=03;BYDAY=-1SU
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20261025T010000
RRULE:FREQ=YEARLY;BYMONTH=10;BYDAY=4SU
END:STANDARD
END:VTIMEZONE
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-PUBLISHED-TTL:PT1H
X-MS-OLK-FORCEINSPECTOROPEN:TRUE
BEGIN:VEVENT
CLASS:PUBLIC
UID:MEC-59386272857f013b167191da57f9eb91@ukstt.org.uk
DTSTART;TZID=Europe/London:20260902T140000
DTEND;TZID=Europe/London:20260902T150000
DTSTAMP:20260624T092420Z
CREATED:20260624
LAST-MODIFIED:20260624
PRIORITY:5
SEQUENCE:9
TRANSP:OPAQUE
SUMMARY:ISTT Webinar
DESCRIPTION:\n\n\n\nAward Category: 2025 ISTT No-Dig Project Award Winner\nProject Name: Snowy 2.0 – Marica Road West HDD: Innovation in Extreme Terrain\nDate: 2 September 2026\nTime: 14:00 – 15:00 GMT (16:00 – 17:00 CEST / 10:00 – 11:00 EDT)\nSpeakers: Bryce Morrow & Glenn Duyvestyn, PhD., PE, PEng (Michels Corporation)\nCost: Free to attend!\n\nAbout the Project\nMichels, an internationally operating contractor in trenchless construction, was asked in 2023 to complete the installation of a critical, extremely complex HDD for the Snowy 2.0 Pumped Hydro Project in New South Wales, Australia. The Marica Road West HDD was necessary for the installation of power, water, and communication cables required to build and operate Snowy 2.0, the largest committed renewable energy project in Australia. Stretching from Lobs Hole to Marica, the Marica Road HDD is 2,248 meters long, an impressive, yet not exceptional, length for a trenchless project. However, the HDD borehole included an elevation difference of 600 meters from low side to high side, a configuration never achieved by HDD. This installation method was deemed to be the best option for the successful installation of a 219-mm (8 5/8-inch) diameter fiberglass reinforced polymer (FRP) carrier pipeline and its critical cables in an environmentally significant area. This presentation explores the technical challenges, innovative solutions, and lessons learned from the project, which was completed between April and July 2023.\n \n\n\n\n  \n\n\n\nCLICK HERE TO REGISTER: ISTT Educational Webinar Registration Form 2nd September 2026 ( https://form.jotform.com/261622676478468 )\n
URL:https://www.ukstt.org.uk/calendar/istt-webinar/
CATEGORIES:Events
ATTACH;FMTTYPE=image/png:https://i0.wp.com/www.ukstt.org.uk/wp-content/uploads/ISTT-EVENTS-PAGE-LOGO.png?fit=1000%2C500&#038;ssl=1
END:VEVENT
END:VCALENDAR
