BEGIN:VCALENDAR
VERSION:2.0
METHOD:PUBLISH
CALSCALE:GREGORIAN
PRODID:-//WordPress - MECv7.33.0//EN
X-ORIGINAL-URL:https://www.ukstt.org.uk/
X-WR-CALNAME:UKSTT
X-WR-CALDESC:TRENCHLESS TECHNOLOGY
X-WR-TIMEZONE:Europe/London
BEGIN:VTIMEZONE
TZID:Europe/London
X-LIC-LOCATION:Europe/London
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20260329T020000
RRULE:FREQ=YEARLY;BYMONTH=03;BYDAY=-1SU
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20261025T010000
RRULE:FREQ=YEARLY;BYMONTH=10;BYDAY=4SU
END:STANDARD
END:VTIMEZONE
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-PUBLISHED-TTL:PT1H
X-MS-OLK-FORCEINSPECTOROPEN:TRUE
BEGIN:VEVENT
CLASS:PUBLIC
UID:MEC-9b29958002fdcce5a0e04baa94987423@ukstt.org.uk
DTSTART;TZID=Europe/London:20260225T140000
DTEND;TZID=Europe/London:20260225T150000
DTSTAMP:20251202T090555Z
CREATED:20251202
LAST-MODIFIED:20260120
PRIORITY:5
SEQUENCE:1
TRANSP:OPAQUE
SUMMARY:ISTT Educational  Webinar
DESCRIPTION:ISTT Educational  Webinar: Prediction of the Deviation of the Horizontal Directional Drilling Line in Sedimentary Soils\nDr.Henk Kruse\nDeltares Delft, The Netherlands\n25th February 2026, 14:00 GMT (15:00 CET, 09:00 US EST)\nRegister now\nOverview\nHorizontal Directional Drilling (HDD) is the most used technique for trenchless installation of cables and pipelines. The HDD technique minimizes the impact of installation activities in densely populated and economically sensitive areas. Due to the presence of other underground infrastructure in the urban and industrial areas, it is necessary to ensure that HDD projects are carried out without damage to underground infrastructure. The available underground space for HDD projects is limited. Therefore, the design drilling lines for the installation of cables and pipelines are often optimized on the design drawings, and during the execution of the horizontal directional drilling, high accuracy demands are prescribed. Although the measurement systems that locate the position of the drill bit have improved considerably over the last decades, deviations from the design drilling line are still common. The deviations are part of the drilling process and depend upon the interaction of the drilling tools and the soil conditions. In sedimentary soils, a deviation analysis on performed HDD projects was carried out. The analysis resulted in an overview of measured deviations and a reconstruction of the processes that caused the deviations. The results of the analysis were used to build a drilling process-based deviation model. The modelling of the deviation processes makes it possible to make a prediction of the expected deviations when a drilling line in certain soil conditions with selected drilling equipment is designed. The deviations can be visualized as a zone around the drilling line in which the probability of damage to adjacent underground infrastructure is present due to deviations from the design drilling line.\nAbout Dr. Henk Kruse\nDr. Henk Kruse is an expert in the field of underground infrastructure. In addition to tunnelling, he spends his time on pipeline installation and maintenance/asset management of pipelines. He has an in-depth knowledge of and experience in soil mechanics, especially in the behaviour of soft soils and pipeline modelling. Since 2002, he has been working for Deltares, the national knowledge institute in the Netherlands for water and soil. Deltares works on solutions for the increasing demand for sustainable energy and the use of underground space under changing climate conditions. The underground infrastructure of the future requires well-considered decisions and sustainable solutions.\nMore information\nNote: This webinar is open to everyone, but only members will have access to the recording.\n
URL:https://www.ukstt.org.uk/calendar/istt-educational-webinar-5/
ATTACH;FMTTYPE=image/png:https://i0.wp.com/www.ukstt.org.uk/wp-content/uploads/ISTT-EVENTS-PAGE-LOGO.png?fit=1000%2C500&#038;ssl=1
END:VEVENT
END:VCALENDAR
