BEGIN:VCALENDAR
VERSION:2.0
METHOD:PUBLISH
CALSCALE:GREGORIAN
PRODID:-//WordPress - MECv7.33.0//EN
X-ORIGINAL-URL:https://www.ukstt.org.uk/
X-WR-CALNAME:UKSTT
X-WR-CALDESC:TRENCHLESS TECHNOLOGY
X-WR-TIMEZONE:Europe/London
BEGIN:VTIMEZONE
TZID:Europe/London
X-LIC-LOCATION:Europe/London
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20260329T020000
RRULE:FREQ=YEARLY;BYMONTH=03;BYDAY=-1SU
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20261025T010000
RRULE:FREQ=YEARLY;BYMONTH=10;BYDAY=4SU
END:STANDARD
END:VTIMEZONE
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-PUBLISHED-TTL:PT1H
X-MS-OLK-FORCEINSPECTOROPEN:TRUE
BEGIN:VEVENT
CLASS:PUBLIC
UID:MEC-5438361912d394a4650e9d40cef63c78@ukstt.org.uk
DTSTART;TZID=Europe/London:20260429T083000
DTEND;TZID=Europe/London:20260429T160000
DTSTAMP:20250206T133943Z
CREATED:20250206
LAST-MODIFIED:20260401
PRIORITY:5
SEQUENCE:19
TRANSP:OPAQUE
SUMMARY:UKSTT Masterclass – Delivery of Capital Works using Trenchless Technologies
DESCRIPTION:UKSTT Masterclass – Delivery of Capital Works using Trenchless Technologies\nDATE: Wednesday 29th April 2026\nVENUE: Woodland Grange Hotel, Old Milverton Lane, Leamington Spa, CV32 6RN\nTIME: 8:30-9:30 Registration, Masterclass starts at 9:30am and finishes at 4pm\n \nDelivery of Capital Works using TRENCHLESS TECHNOLOGIES – the practical applications for the renewal & new installation of networks\nFor engineers involved in asset major investment programmes in strategic assets, such as transmission cabling, pipelines and wastewater networks improvements, we are pleased to announce the latest details of our UKSTT Masterclass taking place in Leamington Spa.\nDesigners, Stantec will detail their approach to the design and optioneering of trenchless delivery on major strategic pipelines. As part of this session, we will then have an open workshop looking at real examples and seek the support of experts attending to consider how any trenchless technique could be optimised.\nSpecialist trenchless contractors, Gallagher, will detail previous projects where they have deployed various trenchless techniques, and explain why they were chosen based on asset diameter, length, ground conditions and working areas. Techniques and case studies include micro-tunnelling, auger-boring, directional drilling and Pipe Direct. This will be followed by an open workshop session.\nHerrenknecht, leading global suppliers of tunnelling equipment, will complement our theme of trenchless new installation for utility infrastructure, exploring the latest tunnelling techniques used across the world, including explaining the Pipe Direct technique in more detail. The opportunity to discuss projects under consideration by delegates will be debated as part of the workshop.\nWhere clients want to seek to retain and renew existing strategic pressure pipelines, such as wastewater rising mains, water supply pipelines or similar pressure systems, the design and application of a close fit Polyethylene Pipe lining technique will be discussed, project case studies explained and a further open discussion available for delegates for consideration of their future projects.\n  \nREGISTER TO ATTEND: click the below link for a copy of the booking form or email ad***@*******rg.uk for further information\nMASTERCLASS – DELIVERY OF CAPITAL WORKS USING TRENCHLESS TECHNOLOGY – FLYER & Booking Form (1) ( https://www.ukstt.org.uk/wp-content/uploads/MASTERCLASS-DELIVERY-OF-CAPITAL-WORKS-USING-TRENCHLESS-TECHNOLOGY-FLYER-Booking-Form-1.pdf )\n\n
URL:https://www.ukstt.org.uk/calendar/ukstt-masterclass-delivery-of-capital-works-using-trenchless-technologies/
ATTACH;FMTTYPE=image/jpeg:https://i0.wp.com/www.ukstt.org.uk/wp-content/uploads/UKSTT-new-masterclass-logo-both-2.jpg?fit=1602%2C1558&#038;ssl=1
END:VEVENT
END:VCALENDAR
