BEGIN:VCALENDAR
VERSION:2.0
METHOD:PUBLISH
CALSCALE:GREGORIAN
PRODID:-//WordPress - MECv7.33.0//EN
X-ORIGINAL-URL:https://www.ukstt.org.uk/
X-WR-CALNAME:UKSTT
X-WR-CALDESC:TRENCHLESS TECHNOLOGY
X-WR-TIMEZONE:Europe/London
BEGIN:VTIMEZONE
TZID:Europe/London
X-LIC-LOCATION:Europe/London
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20260329T020000
RRULE:FREQ=YEARLY;BYMONTH=03;BYDAY=-1SU
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20261025T010000
RRULE:FREQ=YEARLY;BYMONTH=10;BYDAY=4SU
END:STANDARD
END:VTIMEZONE
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-PUBLISHED-TTL:PT1H
X-MS-OLK-FORCEINSPECTOROPEN:TRUE
BEGIN:VEVENT
CLASS:PUBLIC
UID:MEC-59190aac88e5e714d73c276b09f1c3bb@ukstt.org.uk
DTSTART;TZID=Europe/London:20240702T140000
DTEND;TZID=Europe/London:20240702T180000
DTSTAMP:20240513T095959Z
CREATED:20240513
LAST-MODIFIED:20240513
PRIORITY:5
SEQUENCE:0
TRANSP:OPAQUE
SUMMARY:ISTT Webinar – Damage, Causes, and Consequences of Damage during Utility Tunneling
DESCRIPTION:ISTT Webinar – Damage, Causes, and Consequences of Damage during Utility Tunneling\nCategory: Pipe Jacking\nPresenter: Dr.-Ing. Robert Stein\nOrganization: Stein & Partner GmbH/STEIN Ingenieure GmbH, Germany\nDate: 2 July 2024\nTime: 14:00 GMT, 10:00 US EST, 16:00 CEST\nUtility Tunnelling, which includes pipe jacking and microtunnelling, is becoming the predominant construction method for drainage pipelines in metropolitan areas worldwide. With this rise in popularity comes the demand for ever more challenging projects. Put simply, utility tunneling projects are reaching ever greater depths and lengths. In addition, there is a demand for driving curves, S-curves, and even multiple space curves within a single section to optimize the route and increase the cost-effectiveness of pipe jacking. This shift in application limits also increases the risk of execution errors during utility tunneling. This webinar, therefore, presents possible damage, causes, and consequences of damage during pipe jacking and microtunnelling, thus providing important engineering know-how to ensure damage-free Utility Tunnelling even under more demanding boundary conditions. Specifically, damage, causes, and consequences of leaking pipe connections, cracks, spalling, position changes of the jacking pipes, and damage to jacking components are addressed.\nREGISTER NOW ( https://us02web.zoom.us/meeting/register/tZcqfuuqqj8pH93xgaAgGSQdnJsGiDHrX2Vs#/registration )\nAbout Dr.-Ing. Robert Stein\nDr.-Ing. Robert Stein is the Managing Associate of Prof. Dr.-Ing. Stein & Partner GmbH and Managing Director of STEIN Ingenieure GmbH and STEIN Infrastructure Management GmbH. He has been involved with a multitude of utility tunnelling projects. Most notably, as the project manager responsible for the approval process, planning, supervision and quality control of the 52 km long, DN 1400 – DN 2800, deep tunnel sewage system “Emscher Kanal”for the federal state of North Rhine-Westphalia. For the construction of the gas pipeline Nord Stream running through the Baltic Sea, he was in charge of the feasibility study for a trenchless connection of the pipeline in the area of the Greifswalder Bodden on behalf of Nord Stream AG, Switzerland. Since 1995, he has published more than 100 publications, reports, expertise, and feasibility studies. He is the author of the reference book”Wertermittlung von Abwassernetzen (Asset Valuation of Sewer Networks),” Trenchless Technology for Installation of Cables and Pipelines – 2nd Volume: Horizontal Directional Drilling (HDD), of the chapter on pipe jacking works (ATV DIN 18319) and co-author of the 4th edition of the international bestseller “Instandhaltung von Kanalisationen” (Rehabilitation of Drain and Sewer Systems) as well as of various technical articles.\n
URL:https://www.ukstt.org.uk/calendar/istt-webinar-damage-causes-and-consequences-of-damage-during-utility-tunneling/
ATTACH;FMTTYPE=image/png:https://i0.wp.com/www.ukstt.org.uk/wp-content/uploads/ISTT-EVENTS-PAGE-LOGO.png?fit=1000%2C500&#038;ssl=1
END:VEVENT
END:VCALENDAR
