BEGIN:VCALENDAR
VERSION:2.0
METHOD:PUBLISH
CALSCALE:GREGORIAN
PRODID:-//WordPress - MECv7.33.0//EN
X-ORIGINAL-URL:https://www.ukstt.org.uk/
X-WR-CALNAME:UKSTT
X-WR-CALDESC:TRENCHLESS TECHNOLOGY
X-WR-TIMEZONE:Europe/London
BEGIN:VTIMEZONE
TZID:Europe/London
X-LIC-LOCATION:Europe/London
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20260329T020000
RRULE:FREQ=YEARLY;BYMONTH=03;BYDAY=-1SU
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20261025T010000
RRULE:FREQ=YEARLY;BYMONTH=10;BYDAY=4SU
END:STANDARD
END:VTIMEZONE
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-PUBLISHED-TTL:PT1H
X-MS-OLK-FORCEINSPECTOROPEN:TRUE
BEGIN:VEVENT
CLASS:PUBLIC
UID:MEC-b6512ba2ef13d7241ba28dbf20bff5a7@ukstt.org.uk
DTSTART;TZID=Europe/London:20211102T000000
DTEND;TZID=Europe/London:20211103T000000
DTSTAMP:20210624T133647Z
CREATED:20210624
LAST-MODIFIED:20211025
PRIORITY:5
SEQUENCE:0
TRANSP:OPAQUE
SUMMARY:Large Diameter Circular & Non Circular Rehabilitation Masterclass
DESCRIPTION:\nDate: 2nd November 2021\nVenue: National Conference Centre, Coventry Road, Solihull, West Midlands, B92 0EJ\nRoom: The Compton Suite\nA one day masterclass comprehensively covering all aspects of Large Diameter Circular & Non Circular Rehabilitation.\nThe programme will cover a selection of the following topics:\n• The design approach to Sewer Rehabilitation\n• The challenges of aging networks\n• Cloud Point Survey / Defining the issues\n• Case Study – UV Cured Glass Reinforced CIPP Large Diameter Circular & Non Circular projects\n• Case Study – Utilising Applied Felts CIPP Systems\n• Technical Paper – Spiral Wound Relining Pipe\n• Technical Paper – ‘Thinking Big’ – The advancement of Geopolymer Mortars in Trenchless Infrastructure Rehabilitation\n• Case Study – Non Circular Structural Rehabilitation\n• Case Study – Spiral Wound Relining Project\n• Case Study – Bexhill Culvert Rehabilitation (Structural Spray Lining)\n• Delivering Projects combining rehabilitation methods. Two projects: CIPP/GRP & GRP/ Spray Lining\nTo register your interest please contact Lynn by emailing ad***@*******rg.uk or calling 01926 513773\nUKSTT Members Rate: £100.00 + vat per delegate\nNon Members Rate: £130 + vat per delegate\nProgramme Highlights: Keynote Session\nPhil Clisham,  P Clisham Consulting – The challenges of aging networks\nNick Orman,  WRc – The design approach to Sewer Rehabilitation\nFrancieli Thums, Wessex Water – Cloud Point Survey / Defining the issues\nCoffee Break\nFirst Session\nJack Talbot, Impreg – Case Study – UV Cured Glass Reinforced CIPP Large Diameter Circular & Non Circular projects\nDave Cook, Onsite – Case Study – Utilising Applied Felts CIPP Systems\nWerner Hanswillemenke, SWP Systems – Technical Paper – Spiral Wound Relining Pipe\nSteve Henning, Vortex – Technical Paper – ‘Thinking Big’ – The advancement of Geopolymer Mortars in Trenchless Infrastructure Rehabilitation\nLunch Break\nSecond Session\nLeon Woods, Amiblu – Case Study – Structural Slip Lining with GRP Circular & Non-Circular Systems\nJohn Beech- iLine – Case Study – Non Circular Structural Rehabilitation\nWerner Hanswillemenke- SWP Systems – Case Study – Spiral Wound Relining Project\nAndrew Westwell-  Buckhurst Warren – Case Study – Bexhill Culvert Rehabilitation (Structural Spray Lining)\nTea Break\nFinal Session\nLee Forth & Colin Handley- Anglian Water @One Alliance – Delivering Projects combining rehabilitation methods. Two projects: CIPP/GRP & GRP/ Spray Lining\n	\n\n\n	\n\n		\n		\n			\n			\n		\n\n		\n						Large Diameter Circular & Non Circular Rehabilitation Masterclass-Members ( https://www.ukstt.org.uk/product/large-diameter-circular-non-circular-rehabilitation-masterclass-members/ )\n			\n	£100.00 exc vat\n		\n\n					\n				Add to basket	\n			\n
URL:https://www.ukstt.org.uk/calendar/large-diameter-circular-non-circular-rehabilitation-masterclass/
CATEGORIES:Events
ATTACH;FMTTYPE=image/png:https://i0.wp.com/www.ukstt.org.uk/wp-content/uploads/masterclass.png?fit=187%2C99&#038;ssl=1
END:VEVENT
END:VCALENDAR
